Rancho Los Amigos

KPFF Consulting Engineers asked C Below to conduct a complete underground Utility Investigation. Once the investigation was complete, C Below Potholed to verify the utilities which included saw cutting/ coring, vacuum excavation, back fill, Perm-a-Patch, and removal of debris. C Below then surveyed the area and created a CAD drawing of all the findings. Once this was completed, the CAD drawings were delivered to the client and C Below helped them create as-built maps for future projects on the design phase. This work was completed in many phases and started in December of 2012.