Port of Los Angeles

C Below was hired to perform a massive 228 acre, (combined) Utility Investigation and Mapping effort at the Port of Los Angeles over the course of five months. The project included CCTV Video Pipe Inspections of all sewer and storm drain lines to record the pipes current conditions and exact locations. Over 250 Port of LA Google image 2potholes were performed across the Port to visually verify all other existing utilities'  horizontal and vertical specifications. Additionally, by special request, a detailed analysis of all electrical and communication vaults was completed to verify duct bank configurations across the entire site. The final deliverable of the acquired utility details was provided in a 3D model created for the Port of Los Angeles. This model incorporates all current subsurface site details and is being used as a reference for all new Port construction projects.

 

Comments are closed.