Port of LA Berth Rail Yard

C Below was hired by Psomas to provide a Utility Investigation of all existing utilities where the client was looking to Trench or Pothole at the Port of Los Angeles Berth location. By doing the Utility Detection up front, C Below saved the Port up to $10,000 by eliminating unnecessary potholing from our original scope of work.

Comments are closed.